summaryrefslogtreecommitdiff
path: root/gemfeed/2023-08-19-site-reliability-engineering-part-2.html
diff options
context:
space:
mode:
Diffstat (limited to 'gemfeed/2023-08-19-site-reliability-engineering-part-2.html')
-rw-r--r--gemfeed/2023-08-19-site-reliability-engineering-part-2.html5
1 files changed, 4 insertions, 1 deletions
diff --git a/gemfeed/2023-08-19-site-reliability-engineering-part-2.html b/gemfeed/2023-08-19-site-reliability-engineering-part-2.html
index f8ed6e04..89f5db2b 100644
--- a/gemfeed/2023-08-19-site-reliability-engineering-part-2.html
+++ b/gemfeed/2023-08-19-site-reliability-engineering-part-2.html
@@ -16,6 +16,7 @@
<br />
<a class='textlink' href='./2023-08-18-site-reliability-engineering-part-1.html'>2023-08-18 Site Reliability Engineering - Part 1: SRE and Organizational Culture</a><br />
<a class='textlink' href='./2023-08-19-site-reliability-engineering-part-2.html'>2023-08-19 Site Reliability Engineering - Part 2: Operational Balance in SRE (You are currently reading this)</a><br />
+<a class='textlink' href='./2023-08-20-site-reliability-engineering-part-3.html'>2023-08-20 Site Reliability Engineering - Part 3: On-Call Culture and the Human Aspect</a><br />
<br />
<pre>
⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⢀⣠⣾⣷⣄⡀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀⠀
@@ -50,7 +51,9 @@
<br />
<span>That all sounds very romantic. The truth is, it is brutal to archive the perfect balance. No system will ever be perfect. But at least we should aim for it!</span><br />
<br />
-<span>The third part of this blog series will be published soon :-)</span><br />
+<span>Continue with the third part of this series:</span><br />
+<br />
+<a class='textlink' href='./2023-08-20-site-reliability-engineering-part-3.html'>2023-08-20 Site Reliability Engineering - Part 3: On-Call Culture and the Human Aspect</a><br />
<br />
<span>E-Mail your comments to paul at buetow.org :-)</span><br />
<br />